Tule River - Friant Kern Canal Bank

2 Documents in Project

Summary

SCH Number
2019089059
Lead Agency
Porterville Irrigation District
Document Title
Tule River - Friant Kern Canal Bank
Document Type
NOD - Notice of Determination
Received
Posted
9/24/2019
Project Applicant
Porterville Irrigation District

Document Description
The proposed project will involve the construction and operation of six water recovery wells, a turnout from the Woods Central Canal, a pump station, 0.5 miles of canal, one mile of pipeline, an overflow monitoring and alarm system, and 125 acres of permanent groundwater recharge basin to replace 90 acres of existing temporary basins. The purpose of the proposed project is to bank water that is periodically available above current needs from the Friant Division of the Central Valley Project (Friant) and from the Tule River, and to make that water available to lawful recipients during times when it is needed. The project does not entail any modifications to the Friant Kern Canal (FKC) and does not include pump-in of recovered water into the FKC.

Contact Information
Sean Geivet
Porterville Irrigation District
22086 Avenue 160
Porterville, CA 93257

Phone : (559) 784-1208

Location

Counties
Tulare
Parcel #
302-260-016, 302-260-012

Notice of Determination

Approving Agency
Porterville Irrigation District
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
Porterville Irrigation District 22086 Ave 160, Porterville, CA 93257

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination
2019089059_2019 9-19 NOD_Receipt   PDF 578 K

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print