Pocket/Greenhaven 69kV underground Cable Reliability Project

2 Documents in Project

Summary

SCH Number
2019089021
Lead Agency
Sacramento Municipal Utility District
Document Title
Pocket/Greenhaven 69kV underground Cable Reliability Project
Document Type
NOD - Notice of Determination
Received
Posted
10/17/2019
Project Applicant
Sacramento Municipal Utility District

Document Description
The project involves the replacement of approx. 2 miles of existing underground 69kV cable within existing right-of-way and installation of up to 15 new manhole vaults. The alignment extends west beneath Interstate 5 from just southeast of the Florin Road/1-5 interchange to Gloria Drive, where it ends at the Gloria-Florin distribution substation approximately 400 feet west of Florin Road. At Havenslde Drive, the underground bank splits, with one circuit proceeding along Florin Road (to Gloria Drive, as previously discussed) and a second circuit proceeding south on Havenside Drive to the Havenside-Canal substation located immediately west of the Pocket Canal.

Contact Information
Rob Ferrera
Sacramento Municipal Utility District
6201 S Street, Mailstop H201
Sacramento, CA 95817

Phone : (916) 732-6775
rob.ferrera@smud.org

Location

Cities
Sacramento
Counties
Sacramento

Notice of Determination

Approving Agency
Sacramento Municipal Utility District
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
SMUD Customer Service Center, 6201 S Street, Sacramento, CA 95817

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination
2019089021_PocketGreenhaven   PDF 724 K

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print