Permit No. 19444: Sun Pacific Fish Screen and Pump Station

5 Documents in Project

Summary

SCH Number
2019089003
Lead Agency
Yuba County
Document Title
Permit No. 19444: Sun Pacific Fish Screen and Pump Station
Document Type
NOD - Notice of Determination
Received
Posted
12/21/2020
Project Applicant
Paramount Ranch Company

Document Description
Approval of Permit No.19444, under California Code of Regulations, Title 23, Article 3, Section 6 for work within an adopted plan of flood control: to construct the Sun Pacific Yuba River Pump Station Project which includes: a pump, a 18-inch diameter intake pipe partially enclosed in a 30-inch diameter pipe, a 12-foot by 12-foot platform, a self-cleaning retractable fish screen, a 30-foot-tall power pole, and electrical conduit along the left (south) bank of the Yuba River. The intake pipe and platform will be supported by 8-inch diameter piles set at various depths.

Contact Information
Jennifer Stewart
Central Valley Flood Protection Board
3310 El Camino Avenue, Suite 170
Sacramento, CA 95821

Phone : (916) 574-1719
Jennifer.Stewart@cvflood.ca.gov

Location

Counties
Yuba
Other Location Info
The project is located within the Yuba River Designated Floodway, near Dantoni, in Yuba County.

Notice of Determination

Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
The environmental document is available to the general public at the lead agency's office. The Board's administrative record of proceedings related to the encroachment permit is available for public review at the Board's office. Please note, the NOD is not attached. If you would like to request a signed copy of the NOD, please contact Board staff at: questions@cvflood.ca.gov.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search Print