Permit No. 19444: Sun Pacific Fish Screen and Pump Station
5 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2019089003
- Lead Agency
- Yuba County
- Document Title
- Permit No. 19444: Sun Pacific Fish Screen and Pump Station
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 12/21/2020
- Project Applicant
- Paramount Ranch Company
- Document Description
- Approval of Permit No.19444, under California Code of Regulations, Title 23, Article 3, Section 6 for work within an adopted plan of flood control: to construct the Sun Pacific Yuba River Pump Station Project which includes: a pump, a 18-inch diameter intake pipe partially enclosed in a 30-inch diameter pipe, a 12-foot by 12-foot platform, a self-cleaning retractable fish screen, a 30-foot-tall power pole, and electrical conduit along the left (south) bank of the Yuba River. The intake pipe and platform will be supported by 8-inch diameter piles set at various depths.
- Contact Information
-
Jennifer Stewart
Central Valley Flood Protection Board
3310 El Camino Avenue, Suite 170
Sacramento, CA 95821
Phone : (916) 574-1719
Jennifer.Stewart@cvflood.ca.gov
Location
- Counties
- Yuba
- Other Location Info
- The project is located within the Yuba River Designated Floodway, near Dantoni, in Yuba County.
Notice of Determination
- Approving Agency
- Central Valley Flood Protection Board
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- The environmental document is available to the general public at the lead agency's office. The Board's administrative record of proceedings related to the encroachment permit is available for public review at the Board's office. Please note, the NOD is not attached. If you would like to request a signed copy of the NOD, please contact Board staff at: questions@cvflood.ca.gov.
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- No
- (4) A mitigation reporting or monitoring plan was adopted for this project
- No
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes