Design & Innovation Building

Summary

SCH Number
2019080063
Lead Agency
University of California, San Diego (University of California San Diego)
Document Title
Design & Innovation Building
Document Type
NOD - Notice of Determination
Received
Posted
8/1/2019

Document Description
The proposed project would construct approximately 71,200 gross square feet (GSF) of new space for multidisciplinary instruction and research in design, innovation and entrepreneurship. The new facility would encourage collaboration and become a "home base" for design and innovation activities which are currently distributed across the campus in different locations. The building would facilitate a range of activities critical to design and innovation, studio learning, collaboration, research, ideation, experimentation, physical making and engagement. A local serving cafe with outdoor seating including tables and chairs would be located on the first floor, and an outdoor area with publicly accessible terrace areas would be located on the second floor which will allow for interior activities to spill out and engage the surrounding landscape/hardscape areas. The building would be located between the Structural and Materials Engineering Building on the west campus south of Voigt Drive and west of Lyman Lane.

Contact Information
Alison Buckley
University of California
Campus Planning: Physical Planning 9500 Gilman Drive, M.C. 0074
San Diego, CA 92093-0074

Phone : (858) 534-4464

Location

Cities
San Diego
Counties
San Diego
Cross Streets
University of California, San Diego (San Diego County)

Notice of Determination

Approving Agency
University of California
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
University of California, San Diego, Campus Planning Office, 9500 Gilman Drive, Mail Code 0074, La Jolla Ca, 92093-0074, Attn: Alison Buckley, (858) 534-4464.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination
2019080063   PDF 72 K

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.