Former San Pedro Boat Works
2 Documents in Project
Summary
SCH Number
2019079033
Lead Agency
California Department of Toxic Substances Control
(DTSC)
Document Title
Former San Pedro Boat Works
Document Type
NOD - Notice of Determination
Received
Posted
10/8/2019
Document Description
The California Department of Toxic Substances Control (DTSC), pursuant to the authority granted under Chapter 6;8, Division 20, California Health and Safety Code (H&SC) is considering the Proposed Plan (PP)/ draft Removal Action Workplan (RAW) for the former San Pedro Boat Works site (SPBW or the "Site") located at Berths 43 and 44 in the Port of Los Angeles in San Pedro, California. The Los Angeles Harbor Department (LAHD) derives authority to undertake this cleanup action under the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) under 42 United States Code U.S.C. Section 9604, 10 U.S.C. Section 2705.
SPBW is located at the mouth of Watchorn Basin, in the Outer Harbor of the Port of Los Angeles. The construction of the Outer Harbor Dock and Wharf Company facilities on Miner Fill, created a separate and new body of water known as Watchorn Basin
See NOD for full details.
Contact Information
Name
Joseph Cully
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency
Phone
Location
Counties
Los Angeles
Cross Streets
Miner Street, Berths 43 and 44, San Pedro
Notice of Determination
Approving Agency
Department of Toxic Substances Control
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.