New Lateral 4 Facility and Deer Creek Check Structure Retrofit Project

2 Documents in Project

Summary

SCH Number
2019079008
Lead Agency
Pixley Irrigation District
Document Title
New Lateral 4 Facility and Deer Creek Check Structure Retrofit Project
Document Type
NOD - Notice of Determination
Received
Posted
8/14/2019
Project Applicant
Pixley Irrigation District

Document Description
The Project will develop an open channel, gravity conveyance system beginning from the end of the existing West Main Canal and terminating in one of the basin alternatives. The facility will primarily run along the Avenue 116 alignment starting at Road 116 and end between Road 84 and Road 76, with two basin alternatives. Alternative one is the Road 84 basin, and alternative two is the Road 76 basin. Additionally, as a second phase, the District is pursuing options to retrofit the Deer Creek Check Structure with an automated gate system for better managing Friant water flows in Deer Creek for beneficial use within the District.

Contact Information
Eric Limas
Pixley Irrigation District
357 E. Olive Avenue
Tipton, CA 93272

Phone : (559) 686-4716

Location

Counties
Tulare
Other Location Info
Highway 99 and Avenue 116 alignment, Highway 99 and Avenue 72, Tulare County

Notice of Determination

Approving Agency
Pixley Irrigation District
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
357 E. Olive Avenue, Tipton, CA 93272

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination
2019079008_NOD Tulare Co_filed PIXID Lat 4   PDF 566 K