Low Global Warming Potential Refrigeration System Conversion at the Venice Bakery Food Production Facility
Summary
SCH Number
2019070987
Public Agency
California Energy Commission
Document Title
Low Global Warming Potential Refrigeration System Conversion at the Venice Bakery Food Production Facility
Document Type
NOE - Notice of Exemption
Received
Posted
7/24/2019
Document Description
The purpose of this project is to install and operate an advanced, high efficiency transcritical carbon dioxide (CO2) refrigeration system at the Recipient's baked products manufacturing facility. The transcritical CO2 refrigeration system will eliminate the need for conventional, high glo~al warming potential hydrofluorocarbon refrigerants resulting in reduced greenhouse gas emissions, energy consumption, and, operating costs.
Contact Information
Name
Kevin Uy
Agency Name
California Energy Commission
Contact Types
Lead/Public Agency
Phone
Name
Agency Name
Rich Products Corporation
Contact Types
Project Applicant
Location
Cities
Torrance
Counties
Los Angeles
Cross Streets
22417 S Vermont Ave
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
15301, 15302
Reasons for Exemption
This project will install an advanced refrigeration system at the Venice Bakery baked products manufacturing facility in Torrance, CA.
This project will involve minor alteration of existing facilities and mechanical equipment at an existing food processing facility and will result in no expansion of the existing use. The advanced refrigeration system consists of compressors, condensers, evaporators, chillers, storage tanks, heat exchangers, piping and fittings, insulation, and associated control systems. Site preparation niay include a new concrete pad. The materials used to construct the system are chemically inert, not hazardous to human health, and do not have a significant effect on the environment. The systems purchased have safety certifications in compliance with relevant codes and standards. In addition, all required permits for installation and operation of the system will be obtained prior to system installation and demonstration. The demonstration will not have a significant impact on local air quality, noise, or traffic.
Attachments
Notice of Exemption
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.