DC Fast Chargers for California's North-South Corridors ECHC2 (Revised)

1 Documents in Project

Summary

SCH Number
2019070715
Lead Agency
Energy Commission (California Energy Commission)
Document Title
DC Fast Chargers for California's North-South Corridors ECHC2 (Revised)
Document Type
NOE - Notice of Exemption
Received
Posted
7/10/2019
Project Applicant
EVgo Services LLC

Document Description
The project will deploy fifteen electric vehicle charging stations (consisting of twelve direct current fast chargers and five level 2 electric vehicle charging stations) at four sites between Red Bluff and north of Sacramento along Interstate 5. This project will help strengthen the existing but limited fast charge network to extend the range of plug-in electric vehicle miles driven, further support the adoption and growth of plug-in electric vehicles in California, and to help meet the near-term goal of the Governor's Executive Order B-16-12 specifying infrastructure be built to support the fueling of 1 million zero-emission vehicles by 2020.

Contact Information
Thanh Lopez
California Energy Commission
1516 Ninth Street, MS-6
Sacramento, CA 95814

Phone : (916) 654-3929

Location

Counties
Colusa Glenn Yolo
Other Location Info
See Attached NOE for details

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15301, 15303, 15304
Reasons for Exemption
The project consists of minor alteration of existing facilities and/or mechanical equipment involving negligible or .no expansion of use beyond that existing; including replacement or reconstruction of existing utility systems and/or facilities involving negligible or no expansion of capacity and/or minor alterations to land, including minor trenching and back filling where surface is restored. All power will be provided from the existing electrical panel and the work includes installations of conduit, wiring, electrical connections and mounting equipment. Minor trenching may be required to bring power from local sources to the proposed electric vehicle chargers.

Attachments

Notice of Exemption
2019070715   PDF 1149 K
Download CSV New Search