Production Scale-Up of Low-Cost, Long-Life Flow Battery

1 Documents in Project

Summary

SCH Number
2019070642
Public Agency
California Energy Commission
Document Title
Production Scale-Up of Low-Cost, Long-Life Flow Battery
Document Type
NOE - Notice of Exemption
Received
Posted
7/5/2019
Document Description
Under grant Agreement EPC-18-012 with Primus Power Corporation (Primus), the California Energy Commission will provide a grant to fund the production. scale-up of the Primus Power EnergyPod® 2 battery to demonstrate the manufacturability and cost-effectiveness of the battery. It is a zinc bromide flow battery that Primus asserts offers energy storage with an estimated five hours of continuous output at 25 kW, a useful life of 20 years, no electrode stack replacement, and a non-flammable electrolyte. The battery should benefit grid-level electricity storage providers looking for long-duration storage of renewable generated electricity. See Attached NOE For Full Details.

Contact Information

Name
Benson Gilbert
Agency Name
California Energy Commission
Contact Types
Lead/Public Agency

Name
Agency Name
Primus Power Corporation
Contact Types
Project Applicant

Location

Cities
Hayward
Counties
Alameda
Cross Streets
3967 Trust Way

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15061(b)(3)
Reasons for Exemption
See Attached NOE

Attachments

Notice of Exemption

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print