Elco Yards Response Plan

6 Documents in Project

Summary

SCH Number
2019070208
Lead Agency
City of Redwood City
Document Title
Elco Yards Response Plan
Document Type
NOD - Notice of Determination
Received
Posted
6/15/2022
Document Description
The Department of Toxic Substances Control (DTSC) approved the Elco Yards (Site) Response Plan which will address the contaminated soil and groundwater. The Cleanup Decision document, referred to as a Response Plan, summarized the previous environmental investigations at the Site and concluded that excavation of contaminated soil and incorporating a waterproof barrier under the foundations of future buildings with underground parking garages was required to protect human health and the environment. The remedy consists of: 1. Targeted Shallow Soil Excavations 2. Waterproofing and Vapor Intrusion Barrier 3. Recording a Land Use Covenant

Contact Information

Name
Jayantha Randeni
Agency Name
Department of Toxic Substances Control
Job Title
Project Manager
Contact Types
Responsible Agency

Location

Cities
Redwood City
Counties
San Mateo
Regions
San Francisco Bay Area
Other Location Info
113-121 Beech Street, 111 Cedar Street, 150 Elm Street, 1555-1601 El Camino Real, 101 Lathrop Street and 1303-1401 Main Street, Redwood City

Notice of Determination

Approving Agency
Department of Toxic Substances Control
Approving Agency Role
Responsible Agency
Approved On
County Clerk
San Mateo
Final Environmental Document Available at
www.envirostor.dtsc.ca.gov/public/

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Statement of Findings )
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Final Document(s) [Approved_Certified draft environmental documents]

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.