1304 El Camino Real Response Plan

6 Documents in Project

Summary

SCH Number
2019070208
Lead Agency
City of Redwood City
Document Title
1304 El Camino Real Response Plan
Document Type
NOD - Notice of Determination
Received
Posted
4/13/2022
Document Description
The Department of Toxic Substances Control (DTSC) approved the 1304 El Camino Real Response Plan. The Cleanup document, referred to as Response Plan (RP), summarized previous environmental investigations. The RP concluded that the remediation of Volatile Organic Compounds (VOCs) including tetrachloroethene (PCE), trichloroethene (TCE) and chloroform in soil vapor is required for the proposed multi-family residential development. Implementation of the RP activities consists of the following tasks: 1. Installation of Vapor Intrusion Mitigation System (VIMS) beneath the proposed residential development. A passive VIMS will be installed beneath the future site building foundation slab prior to construction of the structural foundation elements (e.g., rebar installation and concrete pouring). The VIMS will be designed to vent sub-slab soil vapors to the exterior of the building by providing a pathway to allow soil vapor to migrate to the building exterior rather than into the building. 2. The recordation of a Land Use Covenant (LUC) that restricts the interference with the Vapor Intrusion Mitigation System without prior written approval by DTSC.

Contact Information

Name
Jayantha Randeni
Agency Name
Department of Toxic Substances Control
Job Title
Project Manager
Contact Types
Responsible Agency

Location

Cities
Redwood City
Counties
San Mateo
Regions
San Francisco Bay Area
Zip
94061
Other Information
1304 El Camino Real, Redwood City

Notice of Determination

Approving Agency
Department of Toxic Substances Control
Approving Agency Role
Responsible Agency
Approved On
County Clerk
San Mateo
Final Environmental Document Available at
www.envirostor.dtsc.ca.gov/public/

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Final Document(s) [Approved_Certified draft environmental documents]

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print