Addendum to the IS/MND for the Caples Lake and Silver Lake East Campground Improvements Project
3 Documents in Project
Summary
SCH Number
2019069119
Lead Agency
El Dorado Irrigation District
Document Title
Addendum to the IS/MND for the Caples Lake and Silver Lake East Campground Improvements Project
Document Type
NOD - Notice of Determination
Received
Posted
7/24/2023
Document Description
The El Dorado Irrigation District has prepared an addendum to the approved IS/MND for the construction of a new well and associated appurtenances at the Silver Lake East Campground to replace the existing spring feed water supply system with a more reliable and safe water supply system. Project activities include:
1) Drilling and developing a new well. 2) Construction of a new utility building previously analyzed in the IS/MND at a new location. 3) Installation of a solar array previously analyzed in the IS/MND at a new location. 4) Installation of a new water line and electrical conduit between the new well location and the utility building. 5) Connecting the new waterline from the new facilities to the existing campground water distribution system. 6) Installation of a new casing and waterline under HWY 88 to supply the Silver Lake West Campground.
Contact Information
Name
Doug Venable
Agency Name
El Dorado Irrigation District
Job Title
Environmental Review Analyst
Contact Types
Lead/Public Agency
Phone
Email
Location
Coordinates
Cities
Kirkwood
Counties
Amador, El Dorado
Regions
Northern California
Cross Streets
HWY 88
Zip
95646
Total Acres
0.5
Parcel #
026020035
State Highways
88
Waterways
Silver Lake
Township
10N
Range
17E
Section
32
Base
M.D.M
Other Location Info
Silver Lake East Campground
Notice of Determination
Approving Agency
El Dorado Irrigation District
Approving Agency Role
Lead Agency
Approved On
County Clerks
Alpine, Amador, El Dorado
Final Environmental Document Available at
https://ceqanet.opr.ca.gov/2019069119/2
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.