Franklin Canyon Recycling Facility

2 Documents in Project

Summary

SCH Number
2019069033
Lead Agency
Contra Costa County
Document Title
Franklin Canyon Recycling Facility
Document Type
NOD - Notice of Determination
Received
Posted
10/25/2019
Document Description
Mahalat Engineering Corporation (Applicant) & Pawan Gir (Owner). County File #LP17-2002: The applicant proposes to establish a new recycling facility for soil, rock, asphalt and concrete for Golden Gate Trucking. The proposed facility is a private facility that would not be open to the public and would accept a maximum of 75 cubic yards per day of soil, rock, asphalt and concrete for processing and recycling. Site improvements include the construction of six separate concrete pad areas for equipment operation and storage, the storage of incoming and processed materials, and access and parking area improvements, totaling approximately 56,000 square feet. Additionally, there would be minor grading required for the preparation of the pad areas and the installation of drainage and stormwater control facilities, which include large bioretention areas within a proposed four-foot-wide drainage swale. The subject property is located at 4225 Franklin Canyon Road in the Unincorporated Martinez area. (Zoning General Agricultural District (A-2); APN: 362-230-012 & -013

Contact Information

Name
Daniel Barrios
Agency Name
Contra Costa County
Contact Types
Lead/Public Agency

Name
Agency Name
Mahalat Engineering Corporation, 4711 Mangels Boulevard, Suite A, Fairfield, CA 94534
Contact Types
Project Applicant

Location

Cities
Martinez
Counties
Contra Costa
Cross Streets
4225 Franklin Canyon Road, Martinez, Contra Costa County

Notice of Determination

Approving Agency
Contra Costa County
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print