NID E. George to Lake Wildwood Ba ckbone Extension Pipeline Project
2 Documents in Project
Summary
SCH Number
2019069025
Lead Agency
Nevada Irrigation District
Document Title
NID E. George to Lake Wildwood Ba ckbone Extension Pipeline Project
Document Type
NOD - Notice of Determination
Received
Posted
8/20/2019
Document Description
The Project is located along the Rough and Ready Highway and other
roads in Nevada County, California. The project spans an approximately 5.6-mile linear alignment that has two sections where it deviates from the roadway and extends across private land. Below is the total alignment and approximate section lengths
See NOD for full Details.
Contact Information
Name
Tonia Tabucchi Herrera
Agency Name
Nevada Irrigation District
Contact Types
Lead/Public Agency
Phone
Name
Agency Name
Nevada Irrigation District
Contact Types
Project Applicant
Location
Counties
Nevada
Other Location Info
The Project is generally located along 5.6 miles of Rough and Ready Highway
in Nevada County, California. The proposed alignment would install approximately 5.6 miles of 16 or 20 inch underground pipeline depending on location within the existing County right-of-way/public roads along Rough and Ready Highway (at West Drive), Rough and Ready Road, Minnow Lane, and Lake Wildwood Drive (at Chaparral Drive). Easement acquisition would be required along private roads Empty Diggins Lane, Riffle Box Road, and Bosa Drive as well as the non-roadway segments at the west end of Riffle Box Road and east of Minnow Lane (along a future fire access road).
Notice of Determination
Approving Agency
Nevada Irrigation District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.