NID E. George to Lake Wildwood Ba ckbone Extension Pipeline Project

2 Documents in Project

Summary

SCH Number
2019069025
Lead Agency
Nevada Irrigation District
Document Title
NID E. George to Lake Wildwood Ba ckbone Extension Pipeline Project
Document Type
NOD - Notice of Determination
Received
Posted
8/20/2019
Project Applicant
Nevada Irrigation District

Document Description
The Project is located along the Rough and Ready Highway and other roads in Nevada County, California. The project spans an approximately 5.6-mile linear alignment that has two sections where it deviates from the roadway and extends across private land. Below is the total alignment and approximate section lengths See NOD for full Details.

Contact Information
Tonia Tabucchi Herrera
Nevada Irrigation District
1036 West Main Street
Grass Valley, CA 95945

Phone : (530) 273-6185

Location

Counties
Nevada
Other Location Info
The Project is generally located along 5.6 miles of Rough and Ready Highway in Nevada County, California. The proposed alignment would install approximately 5.6 miles of 16 or 20 inch underground pipeline depending on location within the existing County right-of-way/public roads along Rough and Ready Highway (at West Drive), Rough and Ready Road, Minnow Lane, and Lake Wildwood Drive (at Chaparral Drive). Easement acquisition would be required along private roads Empty Diggins Lane, Riffle Box Road, and Bosa Drive as well as the non-roadway segments at the west end of Riffle Box Road and east of Minnow Lane (along a future fire access road).

Notice of Determination

Approving Agency
Nevada Irrigation District
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
Nevada Irrigation District 1036 West Main Street, Grass Valley, CA 95945

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes