Operations of ARCO Gas - Brawley and 180 - New Water System Project (Project)

Summary

SCH Number
2019060116
Public Agency
State Water Resources Control Board
Document Title
Operations of ARCO Gas - Brawley and 180 - New Water System Project (Project)
Document Type
NOE - Notice of Exemption
Received
Posted
5/20/2019
Document Description
Arco Gas - Brawley and 180 Will drill a new 30-gallon per minute, 600-foot deep well. A booster pump system on a concrete slab, emergency chlorination system air tank, and control panel will be installed. A 51,000-gallon fire storage tank, 15,000-gallon steel domestic tank, and a 4,100-cubic yard stormwater basin will also be constructed.

Contact Information

Name
Jose Robledo
Agency Name
SWRCB
Contact Types
Lead/Public Agency

Location

Cities
Fresno
Counties
Fresno
Other Location Info
4130 Whitebridge Avenue in Fresno

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15303
Reasons for Exemption
The air tank, control panel, booster pump station; water storage tanks, stormwater basin, and piping involve the construction of a limited number of new, small facilities or structures.

Attachments

Notice of Exemption

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print