North Hollywood to Pasadena Bus Rapid Transit Corridor Project
4 Documents in Project
Summary
SCH Number
2019060110
Lead Agency
Los Angeles County Metropolitan Transportation Authority
(LSCMTA)
Document Title
North Hollywood to Pasadena Bus Rapid Transit Corridor Project
Document Type
NOD - Notice of Determination
Received
Posted
5/2/2022
Document Description
The Proposed Project extends approximately 19 miles from the North Hollywood Metro B/G Line (Red/Orange) Station on the west to Pasadena City College on the east. The Proposed Project would generally include dedicated bus lanes where there is adequate existing street width, while operating in mixed traffic within the City of Pasadena. The bus rapid transit (BRT) service would operate in various configurations depending upon the characteristics of the roadways. The Proposed Project would provide enhanced transit service and improve regional connectivity and mobility by implementing several key BRT elements, including dedicated bus lanes on city streets, transit signal priority (TSP), and enhanced stations with all-door boarding. TSP facilitates buses through signalized intersections and improves transit travel times and reliability.
Contact Information
Name
Scott Hartwell
Agency Name
Los Angeles County Metropolitan Transportation Authority
Job Title
Project Manager
Contact Types
Lead/Public Agency
Phone
Location
Cities
Burbank, Glendale, Los Angeles, Pasadena
Counties
Los Angeles
Regions
Southern California
State Highways
2, 5, 134, 210
Waterways
Los Angeles River, Arroyo Seco
Notice of Determination
Approving Agency
Los Angeles County Metropolitan Transportation Authority
Approving Agency Role
Lead Agency
Approved On
County Clerk
Los Angeles
Final Environmental Document Available at
https://www.metro.net/projects/noho-pasadena-corridor/
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.