Operation of California Water Service-Tulco (CWS-Tulco) - Well 200-02, Replacement to Well 200-01 Project (Project)

Summary

SCH Number
2019060061
Public Agency
State Water Resources Control Board
Document Title
Operation of California Water Service-Tulco (CWS-Tulco) - Well 200-02, Replacement to Well 200-01 Project (Project)
Document Type
NOE - Notice of Exemption
Received
Posted
5/16/2019
Document Description
CWS-Tulco will drill Well 200-02, a 200-gallon per minute, 700-foot deep well, to replace Well 200-01, a 309-foot well. (Well 200-01 is estimated to have had a capacity between 300 and 588 gallons per minute, based on past wells maintained by the previous water system owner on and off the site, including possible wells that Well 200-01 many have replaced.) An approximately 16-ft^2-pad and eight-foot tall shelter will be installed to house the new well. A 300-gallon sodium hypochlorile storage tank will be installed under an approximately 16-ft^2 awning surrounded by a chain link fence. An estimated 25-foot long sodium hypochlorite line, less than an inch diameter, will run from the storage tank to the injection point. Approximately 60-feet of six-inch diameter piping will be installed to connect the replacement well to the existing distribution system. An estimated 18-ft^2, seven-foot tall panel board, a 7.75-ft^2, seven-foot tall electrical cabinet, and associated electrical lines will also be installed on site. Well-200-01 will be destroyed. The Project will provide for the operation of the system .

Contact Information

Name
Chad Fischer
Agency Name
SWRCB
Contact Types
Lead/Public Agency

Location

Counties
Tulare
Other Location Info
Near Road 130 and Avenue 228 near Tulare within Tulare County.

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15302 and 15303
Reasons for Exemption
The replacement of Well 200-01 with Well 200-02 is Class 2, replacement of existing utility systems,involving negligible or no expansion of capacity, (Section 15302 (c),<10%). The sodium hypochlorite tank, panelboard, and electrical cabinet are Class 3, construction of a limited number of new small equipment, (Section 15303(c), < 2500 square feet). The associated water mains and electrical lines includes Class 3, water mains and electrical of reasonable length to serve such construction, (Section 1303(d), water mains <1 mile in length, <16 inch in diameter). The awning and fencing include Class 3(e), accessory structures

Attachments

Notice of Exemption

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print