Soquel Creek Bridge Scour Repair Project (EA-05-1H480) (Environmental Permit Information Management System Notification No. EPIMS-SCR-13112-R3)

6 Documents in Project

Summary

SCH Number
2019059101
Lead Agency
California Department of Transportation, District 5 (DOT)
Document Title
Soquel Creek Bridge Scour Repair Project (EA-05-1H480) (Environmental Permit Information Management System Notification No. EPIMS-SCR-13112-R3)
Document Type
NOD - Notice of Determination
Received
Posted
8/20/2021
Document Description
Caltrans (Permittee) proposes the following: Removal of existing sacked concrete at Bent 12 of the existing Soquel Bridge and the installation of 1,470 cubic yards of rock slope protection (RSP) to an area 148 feet long, 5.5 feet deep and varying widths from 26 to 66 feet at Bent 12 of Soquel Bridge. RSP shall be installed after the existing sacked concrete is removed at a 1.5 to 1 slope with a flat bench section at the top of the bank. The RSP field is 148 feet long, 5.5 feet deep and 26 to 66 feet wide. The RSP shall consist of 873 cubic yards of ½ ton RSP, 597 cubic yards of 1-ton RSP, 138 cubic yards of gravel filter and 130 cubic yards of native streambed material.

Contact Information

Name
Robert Stanley, Senior Environmental Scientist, Specialist
Agency Name
CDFW
Contact Types
Responsible Agency

Location

Counties
Santa Cruz
Regions
Northern California, San Francisco Bay Area
Other Location Info
The Project is located at the Soquel Creek Bridge (Bridge No.38-0013) on State Route 1 (SR-1) at Post-Mile (PM) 13.31, in the County of Santa Cruz, State of California. Latitude, 36.98304, -121.959508.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Santa Cruz
Final Environmental Document Available at
is available to the general public at the office location listed above for the Lead Agency. CDFW’s record of project approval as Responsible Agency is available at CDFW’s regional office.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print