8th, Grand and Hope
4 Documents in Project
Summary
SCH Number
2019050010
Lead Agency
City of Los Angeles
Document Title
8th, Grand and Hope
Document Type
NOD - Notice of Determination
Received
Posted
6/26/2024
Document Description
The Project includes the construction of a 50-story mixed-use development comprised of 580 residential dwelling units and up to 7,499 square feet of ground floor commercial/retail/restaurant space on a 34,679-square-foot site. The Project would provide vehicle parking within three subterranean levels, eight above-grade levels, and on the ground floor. To accommodate the Project, an existing surface parking lot and four-story parking structure would be demolished. The total proposed building floor area would be 554,927 square feet with a maximum height of 592 feet and a floor area ratio of 9.25:1.
Contact Information
Name
Polonia Majas
Agency Name
Los Angeles Department of City Planning
Job Title
City Planning Associate
Contact Types
Lead/Public Agency
Phone
Email
Location
Coordinates
Cities
Los Angeles
Counties
Los Angeles
Regions
Citywide
Cross Streets
S. Hope Street and W. 8th Street
Zip
90012
Total Acres
.80
Parcel #
5144-011-009, 5144-011-016
State Highways
I-10, SR-110, US101
Railways
Metro, Expo,,Metrolink, Amtrak
Airports
N/A
Schools
Multiple schools; see NOC
Waterways
Los Angeles River
Other Location Info
754 South Hope Street; 609 - 625 West 8th Street, Los Angeles, CA, 90017
Notice of Determination
Approving Agency
Los Angeles Department of City Planning
Approving Agency Role
Lead Agency
Approved On
County Clerk
Los Angeles
Final Environmental Document Available at
https://planning.lacity.gov/development-services/eir/8th-grand-and-hope-project-1
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.