Orange Cove Water Treatment / Water Storage Project

3 Documents in Project

Summary

SCH Number
2019049157
Lead Agency
City of Orange Cove
Document Title
Orange Cove Water Treatment / Water Storage Project
Document Type
NOD - Notice of Determination
Received
Posted
8/29/2022
Document Description
The Addendum was prepared to address minor changes that were made to the project description after the MND was adopted by the City in May of 2019. The Addendum addresses installation and operation of approximately 1,130 linear feet of 10” pipeline that will be installed underground along the south side of Highway 63 / Park Boulevard. The pipeline will be used during Friant Kern Canal outages which usually take place every two to three years for 30 to 60 days. During the outage, a diesel pump will be used to pump water from the canal to the storage basins.

Contact Information

Name
Rudy Hernandez
Agency Name
City of Orange Cove
Job Title
Interim City Manager
Contact Types
Lead/Public Agency

Location

Cities
Orange Cove
Counties
Fresno
Regions
Citywide
Cross Streets
SR 63 / Hills Valley Road, 2nd Street
Zip
93646
Parcel #
multiple
State Highways
63
Railways
N/A
Airports
N/A
Schools
multiple in City
Waterways
Friant Kern Canal and various smaller canals

Notice of Determination

Approving Agency
City of Orange Cove
Approving Agency Role
Lead Agency
Approved On
County Clerk
Fresno
Final Environmental Document Available at
City of Orange Cove, 633 Sixth Street, Orange Cove, CA 93646

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print