Meritage Homeowner's Association Grading Abatement

2 Documents in Project

Summary

SCH Number
2019049140
Lead Agency
Santa Clara County
Document Title
Meritage Homeowner's Association Grading Abatement
Document Type
NOD - Notice of Determination
Received
Posted
7/26/2019
Project Applicant
Hanna & Brunetti

Document Description
This application is for a Grading Abatement to restore the site to pre-graded conditions, with the exception of a serpentine bunch outcrop habitat that will not be restored, as recommended by a biologist. On an open space designated parcel, a dam (tributary of Bodfish Creek) was constructed with a pond of approximately 0.5 acres in area, and a berm to fill an approximately 5.6 acre capacity, according to the grading violation report. To restore the site to natural contours, the grading abatement includes an excavation totaling 7,912 cubic yards of cut, and 3,629 cubic yards of fill, and dewatering the dam to restore the site to pre-graded condition. No trees will be removed for this restoration work. A tree protection plan will be implemented to ensure that an existing oak woodland habitat is protected. A ranch road was graded without permits through a serpentine habitat which will remain in its existing condition.

Contact Information
Colleen Tsuchimoto
County of Santa Clara
Department of Planning and Development County Government Center, East Wing, 7th Floor
San Jose, CA 95110

Phone : (408) 299-5797

Location

Counties
Santa Clara
Cross Streets
4420 Hecker Pass Highway Gilroy
Parcel #
810-13-005

Notice of Determination

Approving Agency
County of Santa Clara Land Development Coordinator
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
N/A

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Attachments

Notice of Determination
2019049140 NOD   PDF 2987 K