Tisdale Weir Rehabilitation and Fish Passage Project

5 Documents in Project

Summary

SCH Number
2019049093
Lead Agency
California Department of Water Resources (DWR)
Document Title
Tisdale Weir Rehabilitation and Fish Passage Project
Document Type
NOD - Notice of Determination
Received
Posted
10/13/2021
Document Description
The California Department of Water Resources, Division of Flood Management adopts the Tisdale Weir Rehabilitation and Fish Passage Project which would integrate structural rehabilitation of the Tisdale Weir along with installation of fish passage facilities to allow upstream migrating fish access to the Sacramento River. Structural rehabilitation to the Tisdale Weir would include replacing southern and northern abutment walls; removing and replacing energy dissipation basin; and injection grouting and patching the weir. Fish passage facility installation would include a reconstructing the energy dissipation basin on the downstream side of the weir, installing an operable gate (for flow regulation) in the notch, installing an equipment access pad and attendant facilities at the north end of the weir, and constructing a channel connecting the notch in the weir to the Sacramento River.

Contact Information

Name
Stephanie Ponce
Agency Name
Dept. of Water Resources
Contact Types
Lead/Public Agency

Location

Counties
Sutter
Cross Streets
Four miles west of Sutter Bypass, Sutter County

Notice of Determination

Approving Agency
Department of Water Resources
Approving Agency Role
Lead Agency
Approved On
County Clerk
Sutter
Final Environmental Document Available at
https://water.ca.gov/Programs/Flood-Management/Flood-Projects/Tisdale-Weir

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Final Document(s) [Approved_Certified draft environmental documents]

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print