Waterman Spreading Grounds Basin Maintenance for Water Recharge 1600-2019-0121-R6

2 Documents in Project

Summary

SCH Number
2019049037
Lead Agency
California Department of Fish and Wildlife, Region 6 (CDFW)
Document Title
Waterman Spreading Grounds Basin Maintenance for Water Recharge 1600-2019-0121-R6
Document Type
NOD - Notice of Determination
Received
Posted
9/16/2019
Document Description
The Valley District proposes to annually recharge up to 30,000 acre feet per year (AFY) of State Water Project (SWP), or an average of 15,000 AFY based on water availability, in the Waterman Spreading Grounds in San Bernardino, which are owned and operated by the San Bernardino Flood Control District (SBCFCD). To facilitate the recharge, specific maintenance activities are required In 1 O of the 12 existing percolation basins in the Waterman Spreading Grounds (Proposed Project). Maintenance would generally be conducted in two cycles, one in the late winter/early spring and again in the late summer/early fall and would consist of removing vegetation and excess sediment, ripping/scraping the basin floors, and repair of various basin structures of only the areas of the basins in the Spreading Grounds that will be used for recharge.

Contact Information

Name
Mary Simons
Agency Name
Fish and Wildlife
Contact Types
Lead/Public Agency

Name
Agency Name
San Bernardino Valley Municipal Water District
Contact Types
Project Applicant

Location

Cities
San Bernardino
Counties
San Bernardino
Regions
Southern California
Cross Streets
N Waterman Ave. and SR 18
State Highways
SR 18

Notice of Determination

Approving Agency
Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print