County Operations Center Solar Farm Project

2 Documents in Project

Summary

SCH Number
2019039084
Lead Agency
San Luis Obispo County
Document Title
County Operations Center Solar Farm Project
Document Type
NOD - Notice of Determination
Received
Posted
5/28/2019
Project Applicant
County of San Luis Obispo

Document Description
The proposed approximately 6-acre facility would use a single axis tracker system and consist of up to 2,900 solar modules arranged in 50 rows. Each tracker row would be approximately 200 feet long. Each tracker row would be oriented on a north-south axis. In addition to the solar arrays, a switchboard, transformer, and meter and monitoring equipment would be installed on an equipment pad on the northwest corner of the installation. Six-foot-tall chain-link fencing would surround the installation. A compacted gravel road would be constructed between the solar farm and the current end of Oklahoma Avenue. The total footprint would be approximately 8 acres.

Contact Information
Keith Miller
County of SLO Dept of Public Works
County Govt Center Room 206
San Luis Obispo, CA 93408

Phone : (805) 781-5714
klmiller@co.slo.ca.us

Location

Counties
San Luis Obispo
Other Location Info
Oklahoma Road and Kansas Avenue, on the south side of Hwy 1

Notice of Determination

Approving Agency
County of San Luis Obispo
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
County Govt Center Room 206, San Luis Obispo, CA 93408

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination
2019039084 County Operations Center   PDF 1263 K

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print