Serene Lakes Royal Gorge Headwaters Forest Health Improvements (SNC#1075)
Summary
SCH Number
2019039082
Lead Agency
California Department of Forestry and Fire Protection
(CAL FIRE)
Document Title
Serene Lakes Royal Gorge Headwaters Forest Health Improvements (SNC#1075)
Document Type
NOD - Notice of Determination
Received
Posted
3/14/2019
Document Description
Sierra Nevada Conservancy would provide the Truckee Donner Land Trust with funding for wildfire hazard reduction treatments on 175 acres of red fir stands with a nominal Sierran mixed conifer component. All work will be performed in compliance with the CA Forest Practices Act and an adopted THP prepared for the property (THP No. 2-18-054-PLA, Royal Gorge SNC 2018), which was approved by CAL FIRE on 12/4/2018.
The Forest fields reduction will help minimize the risk of catastrophic wildfire and subsequent environmental damage caused by such conditions by reducing ladder fuels, removing diseased trees, and thinning areas of overstock. These treatments would employ cut to length timber harvesting methods using a rubber-tired processor and forwarder and a rubber-tired chipper in strategic areas with especially high field loadings. Implementation of the THP will be completed by a Licensed Timber Operator under the direction of a Registered Professional Forester, CAL FIRE will monitor compliance with the term of the Timber Harvest Plan.
Contact Information
Name
Shannon Ciotti
Agency Name
Sierra Nevada Conservancy
Contact Types
Lead/Public Agency
Phone
Name
Agency Name
Truckee Donner Land Trust
Contact Types
Project Applicant
Location
Counties
Placer
Township
17/16N
Range
14E
Section
35/3
Notice of Determination
Approving Agency
Sierra Nevada Conservancy
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.