Cosumnes River Bridge Replacement (California Endangered Species Act Incidental Take Permit No. 2081-2019-041-02 (ITP))

12 Documents in Project

Summary

SCH Number
2019039070
Lead Agency
California Department of Transportation, District 3 (DOT)
Document Title
Cosumnes River Bridge Replacement (California Endangered Species Act Incidental Take Permit No. 2081-2019-041-02 (ITP))
Document Type
NOD - Notice of Determination
Received
Posted
3/25/2020
Document Description
The Project includes roadway and related infrastructure improvements over approximately 103.4 acres. The scope of work will include replacing four (4) bridge structures (both Northbound (NB) and Southbound (SB) crossings at the Cosumnes River and the Cosumnes River Overflow (River Bridges)), improving the Dillard Road Overcrossing, relinquishing the McConnell Underpass, replacing the McConnell Overhead structure, realigning the southbound lanes of SR 99, and maintaining access to southbound SR 99 at Eschinger Road with the exception of temporary closure during construction. The Project will impact one (1) Swainson’s hawk (Buteo swainsoni) nest. The project is expected to result in incidental take of Swainson’s hawk which is/are designated as a threatened species under the California Endangered Species Act. The ITP referenced above as issued by CDFW authorizes incidental take of species listed under CESA that may occur as a result of Project implementation.

Contact Information

Name
Dylan Wood
Agency Name
Department of Fish and Wildlife
Contact Types
Lead/Public Agency

Name
Agency Name
California Department of Transportation
Contact Types
Project Applicant

Location

Counties
Sacramento
Regions
Unincorporated
Other Location Info
The Cosumnes River Bridge Replacement (Project) is located along State Route 99 (SR 99) between post miles 7.1 to 9.4, in unincorporated Sacramento County, State of California; Latitude 38.357836 Longitude -121.343594, Section 20, Township 6N, Range 6E, U.S. Geological Survey (USGS) map Galt, approximately 1.5 miles south of Elk Grove. The Project crosses both the Cosumnes River and Cosumnes River Overflow.

Notice of Determination

Approving Agency
Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print