Cosumnes River Bridge Replacement (California Endangered Species Act Incidental Take Permit No. 2081-2019-041-02 (ITP))

8 Documents in Project

Summary

SCH Number
2019039070
Lead Agency
Caltrans, District 3 - Marysville/Sacramento (California Department of Transportation, District 3)
Document Title
Cosumnes River Bridge Replacement (California Endangered Species Act Incidental Take Permit No. 2081-2019-041-02 (ITP))
Document Type
NOD - Notice of Determination
Received
Posted
3/25/2020
Project Applicant
California Department of Transportation

Document Description
The Project includes roadway and related infrastructure improvements over approximately 103.4 acres. The scope of work will include replacing four (4) bridge structures (both Northbound (NB) and Southbound (SB) crossings at the Cosumnes River and the Cosumnes River Overflow (River Bridges)), improving the Dillard Road Overcrossing, relinquishing the McConnell Underpass, replacing the McConnell Overhead structure, realigning the southbound lanes of SR 99, and maintaining access to southbound SR 99 at Eschinger Road with the exception of temporary closure during construction. The Project will impact one (1) Swainson’s hawk (Buteo swainsoni) nest. The project is expected to result in incidental take of Swainson’s hawk which is/are designated as a threatened species under the California Endangered Species Act. The ITP referenced above as issued by CDFW authorizes incidental take of species listed under CESA that may occur as a result of Project implementation.

Contact Information
Dylan Wood
Department of Fish and Wildlife
1701 Nimbus Road, Suite A
Rancho Cordova, CA 95670

Phone : (916) 358-2384

Location

Counties
Sacramento
Regions
Unincorporated
Other Location Info
The Cosumnes River Bridge Replacement (Project) is located along State Route 99 (SR 99) between post miles 7.1 to 9.4, in unincorporated Sacramento County, State of California; Latitude 38.357836 Longitude -121.343594, Section 20, Township 6N, Range 6E, U.S. Geological Survey (USGS) map Galt, approximately 1.5 miles south of Elk Grove. The Project crosses both the Cosumnes River and Cosumnes River Overflow.

Notice of Determination

Approving Agency
Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
The Negative Declaration prepared by the Lead Agency for the project is available to the General Public at the office location listed above for the Lead Agency. CDFW’s administrative record of proceedings is available at the CDFW office identified above.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination
2019039070_2081-2019-041-02 NOD   PDF 147 K 2081-2019-041-02 CEQA Findings   PDF 95 K

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print