Graham Hill Water Treatment Plant Concrete Tanks Replacement Project
3 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2019039049
- Lead Agency
- City of Santa Cruz
- Document Title
- Graham Hill Water Treatment Plant Concrete Tanks Replacement Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 2/22/2021
- Document Description
- The State Water Resources Control Board (State Water Board) is a Responsible Agency for the Project. The State Water Board’s Drinking Water State Revolving Fund (SRF) Program is financing the Project. The City of Santa Cruz proposes replacement of the existing tank system located at the Graham Hill Water Treatment Plant. The project includes demolition and removal of three existing tanks and the construction of the replacement tank system at the same location within the developed site. Replacement of the system also includes ancillary pipelines, pumps, structures, electrical power, controls, and instrumentation, and solids handling equipment, as needed.
- Contact Information
-
Gabriel Edwards
State Water Resources Control Board
Responsible Agency
1001 I Street 16th Floor
Sacramento, CA 95814
Phone : (916) 449-5990
gabriel.edwards@waterboards.ca.gov
Location
- Cities
- Santa Cruz
- Counties
- Santa Cruz
- Regions
- Citywide
- Cross Streets
- 715 Graham Hill Road
- Zip
- 95060
Notice of Determination
- Approving Agency
- State Water Resources Control Board
- Approving Agency Role
- Responsible Agency
- Approved On
- County Clerk
- Santa Cruz
- Final Environmental Document Available at
- City of Santa Cruz, Water Dept. Engineering; 212 Locust Street, Suite C, Santa Cruz, CA 95060
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- Yes
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Attachments
- Notice of Determination
- NOD City of Santa Cruz 4410010-001C PDF 215 K
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.