Butte City Bridge Replacement (Streambed Alteration Agreement No. 1600-2020-0209- R2)

6 Documents in Project

Summary

SCH Number
2019039046
Lead Agency
California Department of Transportation, District 3 (DOT)
Document Title
Butte City Bridge Replacement (Streambed Alteration Agreement No. 1600-2020-0209- R2)
Document Type
NOD - Notice of Determination
Received
Posted
2/4/2021
Document Description
The Project is limited to the replacement of the existing bridge across the Sacramento River (PM 77.3 to 77.6) and the replacement of the existing viaduct across the Sacramento River floodplain (PM 76.7 to 77.45). Excavation, backfill, grading, vegetation removal, concrete work, dewatering, and in-water pile driving will be completed.

Contact Information

Name
Rajpreet Bihala
Agency Name
California Department of Transportation
Contact Types
Lead/Public Agency / Project Applicant / Parties Undertaking Project

Location

Counties
Glenn
Regions
Northern California
State Highways
State Route 162
Waterways
Sacramento River and Rasor Slough
Other Location Info
post miles GLE-162 76.7 - 77.6

Notice of Determination

Approving Agency
California Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Glenn
Final Environmental Document Available at
available to the general public at the office location listed above for the Lead Agency. CDFW’s record of Project approval as Responsible Agency is available at CDFW’s regional office.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print