EVgo Battery Installation (SPEC and HPCP locations)

Summary

SCH Number
2019038483
Public Agency
University of California San Diego
Document Title
EVgo Battery Installation (SPEC and HPCP locations)
Document Type
NOE - Notice of Exemption
Received
Posted
3/20/2019
Document Description
The project proposes to add four (4) battery cabinets to be connected to existing electric vehicle (EV) charging stations at two (2) separate sites located on the east campus. The total footprint of battery cabinets is a single 4-foot by 8-foot area for each site. The battery chemistry is a non-flammable sodium-ion battery from Natron Energy.

Contact Information

Name
Alison Buckley
Agency Name
UC, San Diego, Physical and Community Planning, MC 0074
Contact Types
Lead/Public Agency

Name
Agency Name
UCSD
Contact Types
Project Applicant

Location

Cities
San Diego
Counties
San Diego
Cross Streets
East campus, south of Voigt Drive and east of Campus Point Drive

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
S: 15301
Reasons for Exemption
Based on the above project description, the EVGo battery installation project is classified as exempt from the provisions of CEQA under Section 15301 Class 1 existing facilities. The proposed project consists of minor alterations to existing structures involving no expansion of use. In addition, none of the exceptions to the exemptions apply.

Attachments

Notice of Exemption

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print