Standby Power Generation System Upgrade Project
4 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2019029099
- Lead Agency
- Union Sanitary District
- Document Title
- Standby Power Generation System Upgrade Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 11/17/2020
- Document Description
- The project will replace six existing standby engine generators in a new building containing two minimum rated 3.5 MW engine generators, with room for two future engine generators, and associated electrical equipment; aboveground diesel fuel storage; a future battery storage area; a new electrical substation with electrical connection to new generators; and demolition of selected structures and equipment. These improvements will serve to replace aging standby generators and auxiliary equipment and to adequately supply reliable standby power to existing plant electrical loads for peak demand periods and to facilitate future standby power improvements.
- Contact Information
-
Kevin Chun
Union Sanitary District
Lead/Public Agency
5072 Benson Road
Union City, CA 94587
Phone : (510) 477-7608
kevinch@unionsanitary.ca.gov -
Union Sanitary District
Project Applicant
Location
- Cities
- Union City
- Counties
- Alameda
- Regions
- San Francisco Bay Area
- Zip
- 94587
Notice of Determination
- Approving Agency
- Union Sanitary District
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- Union Sanitary District, 5072 Benson Road, Union City, CA 94587
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- Yes
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Attachments
- Notice of Determination
- NOD-Adddendum Standby Generator Project PDF 176 K
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.