Plant Growth Environments Facility

2 Documents in Project

Summary

SCH Number
2019029085
Lead Agency
University of California, Riverside
Document Title
Plant Growth Environments Facility
Document Type
NOD - Notice of Determination
Received
Posted
5/6/2019
Project Applicant
University of California, Riverside (UC Riverside)

Document Description
The University of California, Riverside (UC Riverside) proposes to provide contemporary plant growth facilities that meet the requirements of a university research program within the East Campus Plant Growth Complex (East Complex) area. The proposed Plant Growth Environments Facility ("project") is the first facility to move forward into the planning, design, and construction stages as defined in the Plant Growth Environments & Support Facilities Relocation Study. The proposed project would involve the demolition of the existing Latthouse B, four plant growth glass houses, one Arabidopsis plant growth house, a temporary compost toilet, and a metal shed totaling approximately 13, 106 square feet. Subsequent to demolition activities, the proposed project would include construction of a 2-story, approximately 38,000 gross square feet, approximately 33-foot high, cast-in-place concrete PGEF structure. See NOD for full details.

Contact Information
Jaime Engbrecht
University of California Physical & Environmental Planning
1111 Franklin Street, 6th Floor
Oakland , CA 94607-5200

Phone : (951) 827-2421

Location

Cities
Riverside
Counties
Riverside
Other Location Info
University of California-Riverside East Campus Plant Growth Complex, at the eastern terminus of Eucalyptus Drive at East Campus Drive.

Notice of Determination

Approving Agency
University of California
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
University of California, Riverside with the Office of Planning, Design, and Construction, 1223 University Avenue, Suite 240, California, 92521.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination
2019029085   PDF 870 K
Download CSV New Search