Richard J. Donovan Correctional Facility Mental Health Crisis Facility

2 Documents in Project

Summary

SCH Number
2019029082
Lead Agency
Corrections and Rehabilitation, Department of (California Department of Corrections and Rehabilitation)
Document Title
Richard J. Donovan Correctional Facility Mental Health Crisis Facility
Document Type
NOD - Notice of Determination
Received

Document Description
The California Department of Corrections and Rehabilitation (CDCR) as lead agency has prepared, considered, and approved the Initial Study/Mitigated Negative Declaration (MND) for the Mental Health Crisis Facility (MHCF) Project at the Richard J. Donovan Correctional Facility (RJDCF), located in San Diego, California. The MHCF would be constructed within the current property boundaries of RJDCF in the western portion of the existing prison grounds (West Site Option). Inmate-patients are typically transferred to a MHCF on a limited-term basis (approximately ten days); when stabilized, the inmates are transferred to correctional facilities that provide the required housing and on-going mental health treatment.

Contact Information
Peter Connelly Jr.
DEPARTMENT OF CORRECTIONS AND REHABILITATION
9838 OLD PLACERVILLE ROAD, SUITE B
SACRAMENTO, CA 95827

9162553010

Location

Cities
San Diego
Counties
San Diego
Other Location Info
Richard J. Donovan Correctional Facility 480 Alta Road

Notice of Determination

Approving Agency
CDCR
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
CDCR, Facility Planning, Construction and Management, 9838 Old Placerville Rd, Suite B, Sacramento, CA 95827. Contact Peter J Connelly Jr., Environmental Services Section, at (916) 255-3010 for copies of the MND and record of project approval.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
N/A
(5) Findings were made pursuant to the provisions of CEQA
N/A

Attachments

Notice of Determination
2019029082   PDF 1246 K
Download CSV New Search