Bear Creek Culvert Rehabilitation Project

2 Documents in Project

Summary

SCH Number
2019029047
Lead Agency
Caltrans 5 (San Luis Obispo) (California Department of Transportation, District 5)
Document Title
Bear Creek Culvert Rehabilitation Project
Document Type
NOD - Notice of Determination
Received
Posted
5/31/2019
Project Applicant
California Department of Transportation, District 5

Document Description
The proposed project will pave the culvert invert (i.e., the lowest part, or floor, of the culvert) with a 6-inch slab of concrete and constructing a fish passage structure to remediate the barrier to fish passage created by stream scour at the culvert outlet. The fish passage structure would be composed of a series of forty weirs (each 26-inches high with a 1-foot-wide by 4-inch-deep low-flow notch). At the culvert outlet, eight pools will be created, each approximately 3-foot by 4-foot in area and will replace the existing concrete apron. An 18-inch walkway will also be constructed along the south culvert wing wall.

Contact Information
Sunny McBride
Caltrans, District 5
50 S Higuera Street
San Luis Obispo, CA 93401

Phone : (805) 549-3718

Location

Counties
Santa Barbara
Cross Streets
Highway 154 and Paradise Road

Notice of Determination

Approving Agency
Caltrans
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
http://www.dot.ca.gov/d5/

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination
2019029047_NOD   PDF 1585 K