Baker Fire Station Replacement Project

2 Documents in Project

Summary

SCH Number
2019029028
Lead Agency
California Department of Forestry and Fire Protection (CAL FIRE)
Document Title
Baker Fire Station Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
3/14/2019
Document Description
The Baker FS Replacement Project consists of the demolition of an existing forest fire station and the construction of a new fire station and related facilities approx. 200 and 500 ft. east of the existing FS. The structures to be demolished includes: 1) a single story office building 2) a single story barracks, 3) an apparatus building and associated ancillary structures. The proposed replacement forest fire station consists of: 1) a 2-engine, single building fire station with Battalion Chief Office (7164 sf). 2) a generator/pump/storage building (648 sf), and 3) ancillary improvements including grading , paving, curbs, gutters, sidewalks, new utilities, including fiver optic extension, storm drainage, septic system, water well, water storage tank and treatment system, hose wash rack and wharf hydrant, above ground fuel vaults. Other improvements include security fencing, gates , and lighting.

Contact Information

Name
Christina Snow
Agency Name
CAL Fire
Contact Types
Lead/Public Agency

Location

Cities
Cottonwood
Counties
Tehama
Other Location Info
14800 Bowman Road

Notice of Determination

Approving Agency
CAL Fire
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print