Folsom Lake Intake Improvements Project
3 Documents in Project
Summary
SCH Number
2019029018
Lead Agency
El Dorado Irrigation District
Document Title
Folsom Lake Intake Improvements Project
Document Type
NOD - Notice of Determination
Received
Posted
5/13/2019
Document Description
The proposed project includes: 1) constructing a temperature control device for ElD's intake facilities in order to preserve the cold-water pool in Folsom Lake to help enhance downstream habitat for anadromous fish species, 2) replacing selected existing pumps with more reliable and efficient equipment, 3) installing infrastructure to provide raw water supply to meet the El Dorado Hills Water Treatment Plant's currently permitted capacity, and 4) improving and optimizing the intake system's appurtenant facilities. The proposed project does not increase the capacity or change the use of the existing facilities being replaced.
Contact Information
Name
Brian Deason
Agency Name
El Dorado Irrigation District
Contact Types
Lead/Public Agency
Phone
Name
Agency Name
El Dorado Irrigation District
Contact Types
Project Applicant
Location
Cities
El Dorado Hills
Counties
El Dorado
Notice of Determination
Approving Agency
El Dorado Irrigation District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.