Cardiff School Modernization and Reconstruction Project

Summary

SCH Number
2019028139
Public Agency
Cardiff School District
Document Title
Cardiff School Modernization and Reconstruction Project
Document Type
NOE - Notice of Exemption
Received
Posted
2/8/2019
Document Description
The Cardiff School Modernization and Reconstruction Project includes the demolition of five 1-story buildings, a portion of another building, and eight relocatable classrooms; construction of 10 1-story wood-framed buildings and a two-classroom addition to an existing buildings; improvements to onsite passenger parking and loading; relocation of play structures; and replacement of the existing baseball field with two natural turf soccer fields. The project would increase the school's building area by 5,289 net square feet, including one new classroom and one specialty lab. The Project would increase the total number of classrooms from 19 to 20 and increase the capacity of the school by 22 seats. Construction would commence summer 2019 and be completed in approx. 19 months.

Contact Information

Name
Randy Peterson
Agency Name
Cardiff School District
Contact Types
Lead/Public Agency

Location

Cities
Encinitas
Cross Streets
1888 Montgomery Ave., Cardiff, CA
Zip
92007

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
S: 15302, 15303, 15314, 15331
Reasons for Exemption
S: 15301 - involves modernization and reconstruction of existing facilities and topographical features with negligible expansion of existing facilities. S: 15302 - involves modernizaion and reconstruction of existing school facilities, in part to provide earthquake resistant structures, on the same site as the structures replaced and will have the same purpose with less than a 50 percent increase in capacity. S: 15303 - involves modernization and reconstruction of existing school facilities and structures in an urbanized area surrounded by development, will not involve the use significant amounts of hazardous substances; S: 15304 - minor alterations in the condition of land and vegetation that do not involve removal of healthy, mature, scenic trees, including grading on land with a slope of less than 10 percent; S; 15314 - modernization and reconstruction of existing school facilities within existing school grounds, and does not increase original student capacity. S: 15331 - rehabilitation of the Little Brick Building would be consistent with the Secretary of the Interior's Standards for the Treatment of Historic Properties with Guidelines for Preserving, ...

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.