Right of Entry to Poseifon Water. LLC for a Geotechnical investigation at Otay River Floodplain and Pond 15

Summary

SCH Number
2019018378
Lead Agency
San Diego Unified Port District
Document Title
Right of Entry to Poseifon Water. LLC for a Geotechnical investigation at Otay River Floodplain and Pond 15
Document Type
NOE - Notice of Exemption
Received

Document Description
The proposed project is a Right of Entry License Agreement (ROELA) to Poseidon Water, LLC (Licensee), its authorized Agents and Contractors to enter upon that certain property located at the former SDG&E power station (west of bay Boulevard) and (property east adjacent of pond 20 former salt pond (north of palm avenue and west of bondary Avenue), to access pond 15 and the Otay River Floodplain which are both in the jurisdiction of the south San Diego Bay Unit of the National Wildlife Refuge. The are proposed for use under this ROELA would be used by liscensee. its authorized agents and contractors for the purpose of performing a geotechnical investigation, in addition, the ROELA would provide ingress and egress of the licensee. furthermore, the license would be responsible for abiding by and conforming to all laws and regulations associated with the activites on or in connection with the above-described premises, including hazards and hazardous materials and stormwater.

Contact Information
Ashley Wright
San Diego Unified Port District
Land Use Planning Department P.O. Box 120488
San Diego, CA 92101-0488

(619) 686-6549

Location

Cities
San Diego Chula Vista
Counties
San Diego
Other Location Info
specific: Pond 15 and the Otay River Floodplain

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15306(infromation collection)
Reasons for Exemption
The project is determined to be categorically exempt pursuant to california environmental Quality Act (CEQA) Guidelines section 15306 (information collection) and section 3.f of the Districts Guidelines for compliance with CEQA because the project is ROELA to perform a geotechnical investigation that would not result in a serious or major disturbance to an environmental resource. Section 3.f of the Districts CEQA Guidelines is as followed: (see NOE for full description).
Download CSV New Search