LAC 556 (Crystal Cove - Laguna Beach) AT&T Pelican RR #4 Conduit Run

Summary

SCH Number
2019018356
Public Agency
California Department of Parks and Recreation
Document Title
LAC 556 (Crystal Cove - Laguna Beach) AT&T Pelican RR #4 Conduit Run
Document Type
NOE - Notice of Exemption
Received
Posted
1/18/2019
Document Description
Install conduit for fiber optic cable from existing AT&T vault to AT&T Cell Site # LAC 556. Two segments totaling approx. 360' feet will require installation of new 4' conduit via underground horizontal boring at a depth of approx. 48 in. The remaining run will be made through existing conduit owned by State Parks. The total run of fiber optic cable is approx. 1,300'. Conduit paths will be bored at a depth of at least 48 in., below any existing conduit or infrastructure. Trucks and boring equipment will be staged in the P4 lot when not in use and overngith during the construction period. The project will take approx. 5 days to complete.

Contact Information

Name
Riley Pratt
Agency Name
California Department of Parks and Recreation
Contact Types
Lead/Public Agency

Location

Counties
Orange
Other Information
Crystal Cove State Park

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
S: 15303
Reasons for Exemption
No potential for significant impacts to the environment is anticipated in compliance with Section 15300.4 if the project is implemented as indicated within the project description including condition provided by CDPR specialists - New construction of small structure.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.