Van Wycke Bicycle and Pedestrian Connectivity Project

2 Documents in Project

Summary

SCH Number
2019012051
Lead Agency
Trinidad, City of (City of Trinidad)
Document Title
Van Wycke Bicycle and Pedestrian Connectivity Project
Document Type
NOD - Notice of Determination
Received

Document Description
The Van Wycke Bicycle and Pedestrian Connectivity Project involves several improvements within the project area to improve both pedestrian and bicycle travel connectivity within the City of Trinidad. Improvements include installation of new curbs, sidewalks and crosswalks, a 5' paved bike lane in the uphill direction of Edwards Street (south side) and sharrows in the downhill direction, and construction of a 5' wide gravel pedestrian trail where the existing Van Wycke Street trail is failing; repair of the trail requires construction of a new retaining wall. Other improvements include split-rail fencing, striping, detectable warning surfaces and directional and interpretive signs.

Contact Information
Becky Price-Hall
City of Trinidad
490 Trinity Street PO Box 390
Trinidad, CA 95570

707.499.6454

Location

Cities
Trinidad
Counties
Humboldt
Other Location Info
Edwards and Van Wycke Streets, City of Trinidad, Humboldt County

Notice of Determination

Approving Agency
City of Trinidad
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
409 Trinity Street, Trinidad, CA 95570

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination
2019012051   PDF 365 K
Download CSV New Search