Solar Photovoltaic (PV) for the WWTP

3 Documents in Project

Summary

SCH Number
2019012043
Lead Agency
City of Placerville
Document Title
Solar Photovoltaic (PV) for the WWTP
Document Type
NOD - Notice of Determination
Received
Posted
3/27/2023
Document Description
The Project consists of clearing an approximately 2.88-acre site of existing vegetation in preparation for installation of a solar photovoltaic (PV) system to provide electricity for the operation of the wastewater treatment plant. Following the removal of vegetation, the area would be seeded with an indigenous low-height ground cover. The existing vegetation, primarily dense tree cover, would be removed. The PV system would be installed on a ground-mounted racking system on piers that would be driven a maximum of eight (8) feet below ground surface.

Contact Information

Name
Cedric S. Irving
Agency Name
State Water Resources Control Board
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Cities
Placerville
Counties
El Dorado
Regions
Citywide
Other Information
The Project is located approximately 3.5 miles west of downtown Placerville at 2300 Cool Water Court, where the Applicant owns and operates the Hangtown Creek Water Reclamation Facility. It is located within the Placerville 7.5-minute Quadrangle, in Township 10 North, Range 10 East, Section 11, in the Southwest ¼ of Section 11.

Notice of Determination

Approving Agency
State Water Resources Control Board
Approving Agency Role
Responsible Agency
Approved On
County Clerk
El Dorado
Final Environmental Document Available at
1001 I Street, Sacramento, CA 95814

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.