Lyon and Sequoia Avenue Pipeline Project

2 Documents in Project

Summary

SCH Number
2019012039
Lead Agency
San Lorenzo Valley Water District
Document Title
Lyon and Sequoia Avenue Pipeline Project
Document Type
NOD - Notice of Determination
Received

Document Description
Installation and operation of 6,400 lf of potable water pipelines and appurtenance structures and abandonment of existing pipeline and removal of 800 lf of existing pipeline within two locations. Lyon Pipeline extends from the Big Steel, Lyon, and Little Lyon Reservoirs along SR 236. Pine Street, and Lomond Street, ending at the Central Ave/Lomond St intersection. Sequoia Ave Pipeline extends along Sequoia Ave from its intersection with Hoot Owl Way. Lyon Pipeline would be constructed from April 2020 through July 2020. Sequoia Ave Pipeline would be constructed in July 2021. Lyon Pipeline construction would entail conventional, open trench construction. Sequoia Ave construction would entail above ground pipeline installation on supports.

Contact Information
Jen Michelsen
San Lorenzo Water Valley District
13060 CA-9
Boulder Creek, CA 95006

831.430.4627

Location

Counties
Santa Cruz
State Highways
9
Other Location Info
Big Basin Way/Sequoia Ave

Notice of Determination

Approving Agency
San Lorenzo Water Valley District
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
13060 CA-9, Boulder Creek, CA 95006

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination
2019012039   PDF 100 K
Download CSV New Search