Design Review DR 24-004 - Mammoth Arts and Cultural Center

4 Documents in Project

Summary

SCH Number
2019012023
Lead Agency
City of Mammoth Lakes
Document Title
Design Review DR 24-004 - Mammoth Arts and Cultural Center
Document Type
NOD - Notice of Determination
Received
Posted
5/20/2025
Document Description
The project includes the construction of a 7,482 square foot, 259-seat performing arts theater attached to the east side of the existing Edison Hall building. The approval includes reconfiguration of the existing Edison Hall parking lot, and other site improvements for the Mammoth Arts and Cultural Center Project. The scope of the proposed project is consistent with the 2023 CEQA Addendum to the 2019 Initial Study/Mitigated Negative Declaration for the Mammoth Arts and Cultural Center Project (2019 IS/MND). The CEQA addendum was prepared to analyze whether the proposed project would result in new or substantially more severe significant environmental effects compared with the impacts disclosed in the approved 2019 IS/MND. The Addendum determined that the Project would not result in any new environmental effects, does not exceed the level of impacts identified in the 2019 IS/MND, and does not trigger the need for preparation of a Subsequent EIR or Negative Declaration under the criteria listed in CEQA Guidelines Section 15162.

Contact Information

Name
Kim Cooke
Agency Name
Town of Mammoth Lakes Planning Division
Job Title
Senior Planner
Contact Types
Lead/Public Agency

Name
Amy Callanan
Agency Name
Town of Mammoth Lakes Engineering/Public Works Department
Job Title
Engineering Manager
Contact Types
Project Applicant / Parties Undertaking Project

Location

Cities
Mammoth Lakes
Counties
Mono
Regions
Citywide
Cross Streets
College Parkway and Meridian Boulevard
Zip
93546
Total Acres
7.9
Parcel #
035010049000
State Highways
203
Railways
N/A
Airports
N/A
Schools
Mammoth High School, Mammoth Middle School, Mammoth Elementary
Waterways
Mammoth Creek

Notice of Determination

Approving Agency
Mammoth Lakes Planning and Economic Development Commission
Approving Agency Role
Lead Agency
Approved On
County Clerk
Mono
Final Environmental Document Available at
https://www.townofmammothlakes.ca.gov/901/Mammoth-Arts-and-Cultural-Center

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (2023 Addendum to the Mammoth Arts and Cultural Center IS/MND)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print