SFPUC Reliable Power Project

5 Documents in Project

Summary

SCH Number
2019012018
Lead Agency
City and County of San Francisco
Document Title
SFPUC Reliable Power Project
Document Type
NOD - Notice of Determination
Received
Posted
12/20/2021
Document Description
The San Francisco Public Utilities Commission (SFPUC) proposes to implement the Reliable Power Project (proposed project) for maintaining the reliability of the SFPUC's electrical transmission system between the Holm and Kirkwood Powerhouses and the Warnerville Substation. The project includes implementation of a long-term vegetation management program that would address the North American Electric Reliability Corporation's reliability standard (F AC-003) and other regulatory requirements that seek to minimize the risk of power outages and fires from vegetation contact with transmission lines on or near the right of way for electrical transmission lines. In addition to implementation of the vegetation management program, the proposed project would include repairs and replacements for culverts associated with transmission line access roads and construction of a sand storage shed to stockpile sand for winter road treatments needed for access during winter months.

Contact Information

Name
Shawn Agarwal
Agency Name
Central Valley Regional Water Quality Control Board
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Name
Timothy Johnston
Agency Name
San Francisco Planning Department
Job Title
Staff Contact
Contact Types
Lead/Public Agency

Location

Regions
Unincorporated
Other Location Info
portions of SFPUC ROW in Stanislaus, Mariposa and Tuolumne Counties

Notice of Determination

Approving Agency
Central Valley Regional Water Quality Control Board
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Tuolumne
Final Environmental Document Available at
https://sfplanning.org/environmental-review-documents

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.