Solano 4 Wind Project, 1600-2019-0318-R3

8 Documents in Project

Summary

SCH Number
2019012016
Lead Agency
Sacramento Municipal Utility District
Document Title
Solano 4 Wind Project, 1600-2019-0318-R3
Document Type
NOD - Notice of Determination
Received
Posted
8/25/2023
Document Description
Horizontal Directional Drilling (HDD) technique will be used to install 10-inch diameter high-density polyethylene (HDPE) casings and a new feeder circuit below four (4) unnamed drainages. The launching and receiving pits will each measure approximately 25 square feet (5 feet wide by 5 feet long). All HDD activities will occur at a minimum depth of approximately four to eleven feet below the ground surface. Additionally, the project involves installation of a new stream crossing, which will allow for transportation of decommissioned turbines off the site and new turbines onto the site for installation. The stream crossing will be in place for a maximum of 18 months while project activities are being conducted.

Contact Information

Name
Mia Bianchi
Agency Name
CDFW
Job Title
Senior Environmental Scientist
Contact Types
Responsible Agency

Location

Cities
Unincorporated area
Counties
Sacramento
Regions
Northern California, San Francisco Bay Area
Other Location Info
Project activities are generally located at five unnamed channels near Montezuma Hills Road and Toland Lane in the City of Rio Vista, County of Solano, State of California.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Sacramento
Final Environmental Document Available at
Bay Delta Region 3 2825 Cordelia Road, Suite 100 Fairfield, CA 94534

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print