Addendum No. 2 to the Solano 4 Wind Project Environmental Impact Report

8 Documents in Project

Summary

SCH Number
2019012016
Lead Agency
Sacramento Municipal Utility District
Document Title
Addendum No. 2 to the Solano 4 Wind Project Environmental Impact Report
Document Type
ADM - Addendum
Received
Document Description
Based on the 100% design and construction drawings, minor modifications to the Solano 4 Wind Project include the following: • The 10-acre laydown yard will now be located at the southwest corner of Solano 4 East (Phase 1) rather than at Solano 4 West as originally proposed. This is also where the construction office trailers will be located. • Power to construction office trailers will be supplied by generators, rather than Pacific Gas & Electric Company (PG&E) distribution lines, which would take 22 months before PG&E could provide a connection. • The location of the access road to Solano 4 East (prior Phase 1) has changed slightly from that analyzed in the EIR; similar to the prior road, construction of this road will result in minor wetland impacts. • Additional borrow sites have been identified in Solano 4 East and West. • A new non-habitable, detached storage structure is proposed west of the existing Operation and Maintenance (O&M) building in a developed area. The existing fence west of the O&M building would be relocated to the west to include the new storage structure in the fenced-in area. • The current alignment of the Solano 4 West homerun line running north-south will be located slightly farther west; the offset from the prior alignment is approximately 100 feet. • Temporary road improvements may be needed at several offsite intersections for the transport and delivery of oversized equipment and materials. • Water for dust control during construction will be drawn through a screened pump intake from the Sacramento River utilizing SMUD’s existing riparian water rights and transporting it to the construction site via an easement with the landowner of the parcel adjacent to the Sacramento River.

Contact Information

Name
Ammon Rice
Agency Name
SMUD
Job Title
Supervisor, Environmental Services
Contact Types
Lead/Public Agency

Location

Counties
Solano
Regions
Countywide, Unincorporated
Cross Streets
Montezuma Hills Road and Toland Lane
Zip
94571
Total Acres
2549

Notice of Completion

Development Types
Power:Wind (Megawatts 91)
Local Actions
Project Development
Project Issues
Air Quality, Biological Resources, Cultural Resources, Transportation, Tribal Cultural Resources, Utilities/Service Systems

Attachments

Final Document(s) [Approved_Certified draft environmental documents]

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.