Pier 4/Wharf 4 Replacement, Piers 1, 5, and 7 Removal, and Quay Wall Reinforcement Project

5 Documents in Project

Summary

SCH Number
2019011069
Lead Agency
San Diego Unified Port District
Document Title
Pier 4/Wharf 4 Replacement, Piers 1, 5, and 7 Removal, and Quay Wall Reinforcement Project
Document Type
NOD - Notice of Determination
Received
Posted
10/14/2022
Document Description
The San Diego Regional Water Quality Control Board issued a Clean Water Act section 401 water quality certification (Certification No. R9-2022-0097) to the Project Applicant to (1) remove and replace a portion of Pier 4 and its marginal wharf (Wharf 4), (2) remove the remainders of Piers 1, 5, and 7, and (3) reinforce the existing quay wall and remove rubble from the San Diego Bay floor. The Project will cause permanent impacts to San Diego Bay. However, the Project will result in an overall net decrease of both structural surface water cover and fill in San Diego Bay after the Project is implemented and provide on-site eelgrass habitat establishment to mitigate for ecological degradation of aquatic resource condition from shading caused by the Pier 4’s expanded footprint will cause the permanent loss of eelgrass habitat. To protect water quality, silt curtains will be deployed to contain turbidity and visual observation and water quality monitoring will be conducted during in-water construction.

Contact Information

Name
Lisa Honma
Agency Name
RWQCB - San Diego Region
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Name
Carlos Aguayo
Agency Name
Continental Maritime of San Diego, LLC
Job Title
President
Contact Types
Project Applicant

Location

Cities
San Diego
Counties
San Diego
Regions
Southern California
Cross Streets
1995 Bay Front Street and 1421-1499 Dewey Street
Zip
92113
Total Acres
1.2
Parcel #
760-021-17-00
State Highways
Highway CA-75
Waterways
San Diego Bay
Other Location Info
Project work will take place in San Diego Bay

Notice of Determination

Approving Agency
RWQCB - San Diego Region
Approving Agency Role
Responsible Agency
Approved On
County Clerk
San Diego
Final Environmental Document Available at
The record of the final MND and MND Addendum No. 1 is at the office of the Lead Agency at 3165 Pacific Highway, San Diego, CA 92101. The record associated with the San Diego RWQCB’s decision is available at 2375 Northside Drive, Ste. 100, San Diego CA 92108, ph. 619-521-1990 (Electronic File No./PIN 880795).

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print