The Meridian Trunk Sewer Improvement Project

2 Documents in Project

Summary

SCH Number
2019011068
Lead Agency
March Joint Powers Authority
Document Title
The Meridian Trunk Sewer Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
3/28/2019
Document Description
The Project will consist of a new 24 to 36-inch diameter vitrified clay pipe (VCP) underground sewer main that runs from north to south, begins by connecting to the existing sewer lines at the lift station within the Meridian Business Park. The alignment then extends southerly under Van Buren Boulevard/Interstate 215. Interchange directly to the WMWD treatment plant approximately 8,600 linear foot (1.6 miles) from the beginning, paralleling the Interstate 215 freeway and the Riverside County Transportation Commission (RCTC) and Atchison, Topeka, and Santa Fe (AT & SF) railroad line. The sewer main will be installed in approximate 100 linear foot segments that will be backfilled and returned to existing conditions after the pipe is installed and inspected. Upon completion of the sewer main, the existing lift station would be removed by demolition. Additionally, the installation of the new sewer line will allow the existing sewer line located on Riverside National Cemetery propriety to ultimately be abandoned. The limits of construction along the sewer line alignment will be 20-feet on either side of the centerline for a total width of 40-feet.

Contact Information

Name
Lauren Sotelo
Agency Name
March Joint Powers Authority
Contact Types
Lead/Public Agency

Name
Agency Name
Meridian Park LLC
Contact Types
Project Applicant

Location

Counties
Riverside
Other Location Info
The Project is located north of Nandina Avenue, south of Cactus Avenue, east of Village West Drive and west of the Interstate 215 freeway.

Notice of Determination

Approving Agency
March Joint Powers Authority
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print