Connect SoCal Program Environmental Impact Report Addendum #2

7 Documents in Project

Summary

SCH Number
2019011061
Lead Agency
Southern California Association of Governments
Document Title
Connect SoCal Program Environmental Impact Report Addendum #2
Document Type
ADM - Addendum
Received
Present Land Use
n/a
Document Description
SCAG has prepared this Addendum #2 to the Connect SoCal PEIR to demonstrate that the proposed changes to the Connect SoCal Project List, contained in Connect SoCal Amendment #1. As part of the RTP/SCS Connect SoCal process, SCAG solicited input from the region’s six County Transportation Commissions (CTCs) regarding updates to their individual project lists. The types of changes reflected in the updated Project List include: • Project is new and not currently included in the Project List; • Connect SoCal Revisions in the Project List include: o Revised description; o Revised schedule; and/or o Change in total cost; • Project is a duplicate and needs to be removed or combined with another project in the Project List; • Project is no longer being pursued and the CTC has requested its removal from the Project List; SCAG has assessed potential environmental effects of the proposed changes to the Project List, contained in the Connect SoCal Amendment #1, at the regional program-level, and finds that the additional and modified projects contained in PEIR Addendum #2 are consistent with the region-wide environmental impacts analysis, mitigation measures or alternatives, and Findings of Fact discussed in the previously certified Connect SoCal PEIR and PEIR Addendum #1, and do not result in any of the conditions described in CEQA Guidelines Section 15162(a)(1)(2)(3). For these reasons, SCAG has elected to prepare an addendum to the Connect SoCal PEIR rather than a Subsequent or Supplemental EIR, and this PEIR Addendum #2 is prepared in accordance with CEQA Guidelines

Contact Information

Name
Karen Calderon
Agency Name
Southern California Association of Governments
Job Title
Senior Regional Planner
Contact Types
Lead/Public Agency

Location

Counties
Imperial, Los Angeles, Orange, Riverside, San Bernardino, Ventura
Regions
Southern California
Other Location Info
Six county area: Ventura, Los Angeles, Riverside, San Bernardino, Orange, Imperial

Notice of Completion

Development Types
Other (none)
Local Actions
none
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation, Wetland/Riparian, Wildfire

Attachments

Final Document(s) [Approved_Certified draft environmental documents]

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print