Refugio Bridge Replacement and Fish Passage Project (Restoration Management Permit No. RMP 2023-0005-R5)

8 Documents in Project

Summary

SCH Number
2019011050
Lead Agency
California Department of Transportation, District 5 (DOT)
Document Title
Refugio Bridge Replacement and Fish Passage Project (Restoration Management Permit No. RMP 2023-0005-R5)
Document Type
NOD - Notice of Determination
Received
Posted
6/2/2023
Document Description
Project will improve passage conditions for Covered Species by removing existing concrete-grouted rock slope protection in the creek bed and replacing it with a step pool roughened channel. The Project will also remove invasive vegetation and revegetate with native plant species. The site of the Project is within the known and documented range of the Covered Species, and the site is known to support individuals of the species. Restoration and management activities associated with the Project will replace the existing north and south bound bridges on State Route 101 that cross Refugio creek. The Project plans were designed to meet the physical and hydraulic design criteria for salmonids included in the CDFW Salmonid Stream Restoration manual.

Contact Information

Name
Christian Romberger
Agency Name
California Department of Fish and Wildlife
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Cities
Santa Barbara
Counties
Santa Barbara
Regions
Southern California
Other Information
The Project is located within Canada del Refugio (also referred to as Refugio Creek), just upstream of Refugio State Beach Campground. The extent of the project is from approximately 100 feet downstream of the southbound State Route 101 to approximately 675 feet upstream of northbound State Route 101. The Project is located in the County of Santa Barbara, State of California; Latitude 34°27'57.0"N and Longitude 120°04'09.6"W

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.