4256 El Camino Real Hotel Project
4 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2018122054
- Lead Agency
- City of Palo Alto
- Document Title
- 4256 El Camino Real Hotel Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 8/7/2020
- Present Land Use
- Service Commercial
- Document Description
- The project would involve demolition of an existing restaurant building and construction of a five-story hotel building at 4256 El Camino Real in Palo Alto. The hotel would include 100 guest rooms, underground parking with mechanical lifts, and an exterior courtyard. Hotel amenities would include a fitness room, business center, restaurant/cafe, and bar. The total gross square feet (sf) of the project would be approximately 51,300 sf. The building roof height would be 50 feet, with mechanical equipment and an associated mechanical screen extending no more than 8 feet above the maximum ridge of the roof. The rear of the building would include an outdoor patio area with a pedestrian path, seating, a lounge area, and a gathering space with a fire pit for use by hotel guests. Parking would include 85 parking stalls plus 17 valet aisle spaces for a total of 102 vehicle spaces located in a two-level subterranean garage accessible via a driveway from El Camino Real.
- Contact Information
-
Samuel Jacob Gutierrez
City of Palo Alto
Lead/Public Agency
250 Hamilton Avenue, Fifth Floor
Palo Alto, CA 94301
Phone : (650) 329-2225
samuel.gutierrez@cityofpaloalto.org -
Randy Popp
Project Applicant
Location
- Cities
- Palo Alto
- Counties
- Santa Clara
- Parcel #
- 167-08-042
Notice of Determination
- Approving Agency
- City of Palo Alto
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- https://www.cityofpaloalto.org/news/displaynews.asp?NewsID=4124
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- Yes
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Attachments
- Notice of Determination
- Cert NOD filing SSC PDF 1022 K
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.