4256 El Camino Real Hotel Project

4 Documents in Project

Summary

SCH Number
2018122054
Lead Agency
City of Palo Alto
Document Title
4256 El Camino Real Hotel Project
Document Type
NOD - Notice of Determination
Received
Posted
8/7/2020
Present Land Use
Service Commercial
Document Description
The project would involve demolition of an existing restaurant building and construction of a five-story hotel building at 4256 El Camino Real in Palo Alto. The hotel would include 100 guest rooms, underground parking with mechanical lifts, and an exterior courtyard. Hotel amenities would include a fitness room, business center, restaurant/cafe, and bar. The total gross square feet (sf) of the project would be approximately 51,300 sf. The building roof height would be 50 feet, with mechanical equipment and an associated mechanical screen extending no more than 8 feet above the maximum ridge of the roof. The rear of the building would include an outdoor patio area with a pedestrian path, seating, a lounge area, and a gathering space with a fire pit for use by hotel guests. Parking would include 85 parking stalls plus 17 valet aisle spaces for a total of 102 vehicle spaces located in a two-level subterranean garage accessible via a driveway from El Camino Real.

Contact Information

Name
Samuel Jacob Gutierrez
Agency Name
City of Palo Alto
Contact Types
Lead/Public Agency

Name
Agency Name
Randy Popp
Contact Types
Project Applicant

Location

Cities
Palo Alto
Counties
Santa Clara
Parcel #
167-08-042

Notice of Determination

Approving Agency
City of Palo Alto
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print